System name Containment level Place of installation Beam type
ESP/4.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.6 m A /
Tested length System width The depth of the pile
60 m 0.18 m 1,20 m 1.45 m

slika
slika
System name Containment level Place of installation Beam type
ESP/2.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A /
Tested length System width The depth of the pile
60 m 0.18 m 1,20 m 1.05 m

slika
slika
System name Containment level Place of installation Beam type
ESP Plus/2.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m A /
Tested length System width The depth of the pile
60 m 0.18 m 1,20 m 0.95 m

slika
slika
System name Containment level Place of installation Beam type
ESP Plus W1 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W1 0.5 m B /
Tested length System width The depth of the pile
40 m 0.18 m 1,20 m 0.35 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL ES/1.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.5 m A /
Tested length System width The depth of the pile
40 m 0.18 m 1.05 m 0.35 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL ES/1.33 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.7 m A /
Tested length System width The depth of the pile
60 m 0.18 m 1.05 m 0.55 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/4.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.6 m A /
Tested length System width The depth of the pile
48 m 0.14 m 1,00 m 1.46 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/2.0 MPS N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m A /
Tested length System width The depth of the pile
48 m 0.14 m 1,00 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/1.33 MPS N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.8 m A /
Tested length System width The depth of the pile
48 m 0.14 m 1,00 m 0.65 m

slika
slika
System name Containment level Place of installation Beam type
ESP/4.0 UFS N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.4 m A /
Tested length System width The depth of the pile
60 m 0.18 m 1,20 m 1.25 m

slika
slika
System name Containment level Place of installation Beam type
ESP BOS N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.2 m B /
Tested length System width The depth of the pile
20 m 0.86 m 1,20 m 0.05 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL 1.33 H2 W5 TYPE B N2 Embankment/Bank Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m A /
Tested length System width The depth of the pile
44 m 0.21 m 0,96 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL PLUS 1.00 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W1 0.3 m B /
Tested length System width The depth of the pile
60 m 0.34 m 0,80 m 0.15 m

slika
slika
System name Containment level Place of installation Beam type
EDSP/1.33 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m A 2.00 m
Tested length System width The depth of the pile
60 m 0.5 m 1.28 m 0.95 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL ES/1.0 L1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.7 m A 1.40 m
Tested length System width The depth of the pile
40 m 0.21 m 1.05 m 0.55 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL ES/1.33 L1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1 m A 1.30 m
Tested length System width The depth of the pile
60 m 0.21 m 1.05 m 0.85 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/2.0 MPS L1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A 2.10 m
Tested length System width The depth of the pile
48 m 0.14 m 1.00 m 1.05 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/1.3 MPS L1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.8 m A 2.20 m
Tested length System width The depth of the pile
48 m 0.14 m 1.00 m 0.65 m

slika
slika
System name Containment level Place of installation Beam type
DDSP/4.0 doppelt H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W6 1.8 m A 2.10 m
Tested length System width The depth of the pile
60 m 0.8 m 1.28 m 1.45 m

slika
slika
System name Containment level Place of installation Beam type
UNIRAIL 3.0 H1W3 H1 Embankment/Bank Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m A 1.20 m
Tested length System width The depth of the pile
49.5 m 0.21 m 0.89 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
UNIRAIL 1.33 TYPE B L1 Embankment/Bank Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m A 1.70 m
Tested length System width The depth of the pile
44 m 0.21 m 0.96 m 0.95 m

slika
slika
System name Containment level Place of installation Beam type
UNIRAIL 2.66 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1 m A 2.00 m
Tested length System width The depth of the pile
54.0 m 0.21 m 0.98 m 0.85 m

slika
slika
System name Containment level Place of installation Beam type
EDSP/2.0 H2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W8 2.9 m A /
Tested length System width The depth of the pile
68 m 0.5 m 1.28 m 2.75 m

slika
slika
System name Containment level Place of installation Beam type
DDSP/2.0++ doppelt H2 Embankment/Bank Profile A
Working Width Dynamic deflection ASI Vehicle intrusion
W6 1.7 m A 2.10 m
Tested length System width The depth of the pile
80 m 0.8 m 1.28 m 1.55 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.8 m A 1.30 m
Tested length System width The depth of the pile
40 m 0.5 m 1.26 m 0.65 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL VZB L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.5 m B 0.90 m
Tested length System width The depth of the pile
28 m 0.5 m 1.26 m 0.35 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL doppelt L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.6 m B 1.00 m
Tested length System width The depth of the pile
60 m 0.86 m 1.26 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.7 m A 1.30 m
Tested length System width The depth of the pile
52 m 0.45 m 1.01 m 0.55 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco doppelt L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.7 m B 1.40 m
Tested length System width The depth of the pile
52 m 0.45 m 1.01 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco MUF L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m A 1.40 m
Tested length System width The depth of the pile
52 m 0.45 m 1.01 m 0.95 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco HS L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.6 m B 0.80 m
Tested length System width The depth of the pile
36 m 0.37 m 1.05 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Light H2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.1 m B 2.40 m
Tested length System width The depth of the pile
52 m 0.45 m 1.11 m 0.92 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL 3W 1.5 H2 Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m B 1.00 m
Tested length System width The depth of the pile
45 m 0.29 m 0.87 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL 3W 2.0 H2 Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.6 m A 2.10 m
Tested length System width The depth of the pile
40 m 0.35 m 1.00 m 1.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL HS L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.5 m B 0.80 m
Tested length System width The depth of the pile
60 m 0.45 m 1.11 m 0.35 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL 1.33 TYPE B L2 Embankment/Bank Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.5 m A 1.60 m
Tested length System width The depth of the pile
44 m 0.21 m 0.96 m 1.35 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL 1.33 TYPE A H2 Embankment/Bank Profile A
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.6 m A 2.30 m
Tested length System width The depth of the pile
44 m 0.21 m 0.96 m 1.45 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL PLUS 1.33 H2 Embankment/Bank Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m B 1.50 m
Tested length System width The depth of the pile
44 m 0.21 m 0.79 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL ULTRA 3W 1.5 H2 Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.7 m B 1.40 m
Tested length System width The depth of the pile
49 m 0.29 m 0.87 m 0.55 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL PLUS 1.00 L2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.6 m B 1.40 m
Tested length System width The depth of the pile
60 m 0.34 m 0.80 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL L4b Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W7 2 m A 2.50 m
Tested length System width The depth of the pile
76 m 0.5 m 1.16 m 1.85 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL doppelt L4b Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 0.9 m B 3.40 m
Tested length System width The depth of the pile
60 m 0.86 m 1.26 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Pro L4b Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m B 3.60 m
Tested length System width The depth of the pile
60 m 0.32 m 1.01 m 0.95 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL HS L4b Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.9 m B 3.30 m
Tested length System width The depth of the pile
60 m 0.45 m 1.11 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco HS L4b Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.9 m B 4.10 m
Tested length System width The depth of the pile
80 m 0.37 m 1.05 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
Eco Safe 1.33 Bw N2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W1 0.5 m A 0.00 m
Tested length System width The depth of the pile
36 m 0.3 m 0.125 m 0.35 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe 1.33 Bw L1 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.6 m A 2.40 m
Tested length System width The depth of the pile
36 m 0.3 m 0.125 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Bw L2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.6 m B 1.20 m
Tested length System width The depth of the pile
36 m 0.5 m 0.125 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Bw doppelt L2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.6 m B 1.20 m
Tested length System width The depth of the pile
36 m 0.86 m 0.125 m 0.45 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco Bw L2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.9 m A 1.40 m
Tested length System width The depth of the pile
60 m 0.45 m 0.125 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Light Bw H2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.8 m B 1.40 m
Tested length System width The depth of the pile
36 m 0.45 m 0.125 m 0.65 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco Bw doppelt L2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.9 m B 1.40 m
Tested length System width The depth of the pile
60 m 0.7 m 0.125 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Eco HS Bw L2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W1 0.4 m B 0.70 m
Tested length System width The depth of the pile
36 m 0.37 m 0.125 m 0.25 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL HS Bw L2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.4 m B 0.80 m
Tested length System width The depth of the pile
60 m 0.45 m 0.125 m 0.25 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL PLUS 1.33 BW H2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.7 m B 1.30 m
Tested length System width The depth of the pile
44 m 0.34 m 0.125 m 0.55 m

slika
slika
System name Containment level Place of installation Beam type
UNI RAIL 3W 1.5 BW H2 On the bridge/Concrete Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m B 1.20 m
Tested length System width The depth of the pile
54 m 0.34 m 0.190 m 0.95 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Plus Bw H4b On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W6 1.2 m B 3.50 m
Tested length System width The depth of the pile
80 m 0.6 m 0.125 m 1.05 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL Pro Bw L4b On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.3 m B 1.70 m
Tested length System width The depth of the pile
72 m 0.32 m 0.125 m 0.15 m

slika
slika
System name Containment level Place of installation Beam type
SUPER RAIL HS Bw L4b On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.9 m B 4.20 m
Tested length System width The depth of the pile
60 m 0.45 m 0.125 m 0.75 m

slika
slika
System name Containment level Place of installation Beam type
EDSP/2.0 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.3 m A 2.30 m
Tested length System width The depth of the pile
60 m 0.5 m 1.28 m 1.15 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/2.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m A 0.00 m
Tested length System width The depth of the pile
48 m 0.14 m 1,00 m 0 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/1.33 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.8 m A 0.00 m
Tested length System width The depth of the pile
48 m 0.14 m 1,00 m 0 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/2.0 L1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A 2.10 m
Tested length System width The depth of the pile
48 m 0.14 m 1.00 m 1.05 m

slika
slika
System name Containment level Place of installation Beam type
Eco-Safe/1.33 L1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.8 m A 2.20 m
Tested length System width The depth of the pile
48 m 0.14 m 1.00 m 0.65 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 2.66 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 1 m A /
Tested length System width The depth of the pile
64 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT 4.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.4 m A /
Tested length System width The depth of the pile
64 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE EASY 4.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.5 m A /
Tested length System width The depth of the pile
64 m 0.21 m 0.95 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 1.33 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 1.5 m A 1.00 m
Tested length System width The depth of the pile
80 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT 2.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.8 m A /
Tested length System width The depth of the pile
64 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE EASY 2.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 1 m A /
Tested length System width The depth of the pile
64 m 0.21 m 0.95 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT 2.66 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.7 m A /
Tested length System width The depth of the pile
88 m 0.21 m 0.95 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 4.0 N2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A /
Tested length System width The depth of the pile
56 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 2.0 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m A 3.30 m
Tested length System width The depth of the pile
56 m 0.21 m 1.04 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 2.0 BW H1 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.7 m A 2.80 m
Tested length System width The depth of the pile
68 m 0.21 m 0.125 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 3W 2.66 H2 Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.1 m A 1.50 m
Tested length System width The depth of the pile
72 m 0.21 m 0.9 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE SM 3W 2.00 H2 Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.5 m A 1.20 m
Tested length System width The depth of the pile
48 m 0.31 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT 3W 2.00 BW H2 On the bridge/Concrete Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W4 0.9 m B 1.70 m
Tested length System width The depth of the pile
52 m 0.21 m 0.165 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 3W 2.00 BW H2 On the bridge/Concrete Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.6 m B 0.90 m
Tested length System width The depth of the pile
52 m 0.315 m 0.165 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE SM 3W 2.00 BW H2 On the bridge/Concrete Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.7 m B 1.10 m
Tested length System width The depth of the pile
48 m 0.315 m 0.25 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE SM 3W 1.33 BW H2 On the bridge/Concrete Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.6 m B 1.10 m
Tested length System width The depth of the pile
48 m 0.33 m 0.25 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE DOUBLE 1.33 H2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m B 1.42 m
Tested length System width The depth of the pile
80 m 0.31 m 0.92 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE DOUBLE 2.0 H2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.6 m A 2.00 m
Tested length System width The depth of the pile
80 m 0.28 m 0.93 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE M DOUBLE 1.33 H2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.5 m B 1.00 m
Tested length System width The depth of the pile
52 m 0.41 m 1.0 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT DOUBLE 2.0 H2 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A 1.90 m
Tested length System width The depth of the pile
52 m 0.26 m 1.04 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE DOUBLE 1.33 BW H2 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W2 0.4 m B 0.90 m
Tested length System width The depth of the pile
52 m 0.41 m 0.165 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE PRO 3W 2.0 H3 Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.3 m A 2.80 m
Tested length System width The depth of the pile
81 m 0.41 m 1.01 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE PRO 3W 2.0 BW H4b On the bridge/Concrete Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.7 m A 2.30 m
Tested length System width The depth of the pile
81 m 0.55 m 0.175 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE EASY 2.0 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A 2.30 m
Tested length System width The depth of the pile
40 m 0.21 m 0.95 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE PRO 3W 2.0 H4b Embankment/Bank Triple beam
Working Width Dynamic deflection ASI Vehicle intrusion
W5 1.6 m A 1.60 m
Tested length System width The depth of the pile
81 m 0.55 m 1.01 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT 2.0 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1 m A 1.80 m
Tested length System width The depth of the pile
64 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE LIGHT 2.66 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W3 0.9 m A 1.70 m
Tested length System width The depth of the pile
88 m 0.21 m 0.95 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 4.0 H1 Embankment/Bank Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W4 1.2 m A 2.70 m
Tested length System width The depth of the pile
56 m 0.21 m 0.85 m 0 m

slika
slika
System name Containment level Place of installation Beam type
UNISAFE 1.33 BW H1 On the bridge/Concrete Profile A and Profile B
Working Width Dynamic deflection ASI Vehicle intrusion
W1 0.3 m A 1.10 m
Tested length System width The depth of the pile
68 m 0.21 m 0.125 m 0 m